Renewable Energy
Projects/Studies Presently On-going in Guyana
|
| |
- Pre-feasibility study was completed in August
2001 for the Turturba Rapids 760MW hydro-power
project. Preparations are in progress to commence a
full feasibility study.
- Optimisation studies for Amaila Falls (Region 7)
100MW hydro-project are presently in progress, in
preparation for PPA negotiations. The feasibility
study was completed in 2001.
- PPA negotiations are currently in progress for
an 11.4MW wind farm at Hope Beach, East Coast
Demerara (Region 4).
- A solar electricity project is in progress at
Orinduik (Region 8) to install a 1500W photo-voltaic
system to supply a small guest house with
electricity for lighting, small appliances and a
small water supply system.
- A solar electricity project is in progress
Kabakaburi (Region 2) to install a 1500W
photo-voltaic system to supply a health center with
electricity for lighting and small appliances
including a vaccine refrigerator.
- Two (2) 1500W solar electricity projects were
commissioned in October, 2005 at Paruima and Kato in
Regions 7 and 8 respectively. These projects were
implemented under a project titled “Capacity
Building and Demonstration Projects for Hinterland Unserved Areas Utilizing Renewable Energy Sources”
and were financed from a grant from UNDP.
These projects will be assessed over the short
and medium terms for the socio-economic impact on
the communities, and to demonstrate to other
communities the benefits of utilizing renewable for
development. More information about these projects
can be obtained at:
http://www.electricity.gov.gy/
|