BACKGROUND
In July 2000, the European Commission (EC) and the African, Caribbean and Pacific (ACP) States signed a Financing Agreement committing EUR 20 million
from the resources of the 8
th European Development Fund (EDF) to support regional cooperation in the field of HIV/AIDS across all ACP States. The overall
objective of the project is to contribute to efforts to minimize the spread and impact of the HIV/AIDS epidemic through a regional approach.
Within the framework Financing Agreement for the above project, EUR 6,919,220 has been set aside to strengthen the institutional response to HIV/AIDS/STI
in the Caribbean region, specifically in the 15 CARIFORUM Member States (Antigua and Barbuda, Bahamas, Barbados, Belize, Dominica, Dominican
Republic, Grenada, Guyana, Haiti, Jamaica, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Suriname, Trinidad and Tobago). The technical and
financial provisions for this project are set out in the Implementing Document to Framework Financing Agreement No. 6054/REG. The purpose of the project
is to strengthen the capacity of existing regional institutions to plan and coordinate an effective response to HIV/AIDS/STI, especially in the worst affected
countries.
The Secretary-General of the CARIFORUM Secretariat is designated as the Regional Authorising Officer (RAO) for the project. The Head of the CARICOM
Human and Social Development Division is designated as the Deputy Regional Authorising Officer (DRAO) for the project and effectively responsible for
project implementation in conjunction with the EC Delegation in Georgetown.
The main outputs of the project are:
- An increased pool of appropriately skilled personnel able to contribute to effective policy development, planning and implementation of HIV/AIDS/STI
programmes
- Increased awareness of the benefits, costs and operational feasibility of interventions to reduce mother to child transmission of HIV/AIDS
- An expanded and effective regional network of people with HIV/AIDS in six countries advocating for improved care and support and contributing to
national policy development
- Improved regional capacity to design, implement and evaluate interventions to reduce high-risk behaviour related to the spread of STI/HIV infection
- More comprehensive and accurate information on the course, consequences and costs of the epidemic through improved surveillance, monitoring and
evaluation of national control programmes and through operational research
The details of these outputs are stated in Section 3.3 of the ADDENDUM TO FRAMEWORK FINANCING AGREEMENT No.6054/REG.
The principal institutions involved in the implementation of the project include the CARICOM Secretariat, the Caribbean Epidemiology Centre (CAREC),
UNAIDS, the Caribbean Network of People Living with HIV/AIDS (CRN+), the University of the West Indies (UWI) and the Caribbean Health Research
Council (CHRC). The project will establish a Project Implementation Unit (PIU) within the Human and Social Development Division of the CARICOM
Secretariat, headed by a Project Manager recruited under the project. In addition, a Project Management Group (PMG), comprising senior operational
managers of the partner institutions, and a Project Advisory Group (PAG), a sub-group of the existing Regional AIDS Taskforce, will be set up to oversee the
project.
The project duration is three and half years including a 6-month start-up period, which will commence on 1 January 2001. The project will be implemented
through a combination of annual work programmes and cost estimates for recurrent activities coupled with individual and/or institutional service or grant
contracts for longer-term personnel.
This start-up work programme and cost estimate details the activities and funding required between 15 December 2000 and 30 June 2001 to launch the project.
This document commits US$392,589.00 (Euro 447,038.26) for the funding of the activities described in the following section and costed in Annex 1 "Cost
Estimate".
DESCRIPTION OF ACTIVITIES
The principal activities that are to be carried out under this start-up work programme and cost estimate include:
- Advertise post for and recruit project manager
- Advertise posts for and recruit temporary Project Implementation Unit (PIU) staff including accountant and administrative secretary
- Establish and equip the PIU premises
- Advertise for and recruit short-term consultant
- Establish the Project Management Group (PMG) and Project Advisory Group (PAG)
- Organise project inception workshop and inaugural PMG and PAG meetings
- Launch staff recruitment and preparatory activities in the participating institutions
- Prepare terms of reference and technical and contractual documentation for the service/grant contracts with the participating institutions
- Prepare the first annual work programme and cost estimate
- Prepare quarterly financial statements and six-monthly progress reports
- Re-advertising of permanent positions for the PIU, if necessary
- Prepare baseline survey on the existing situation (to be done by CHRC)
- Identification of training needs and manpower needs assessment to establish training activities (to be done by
UWI)
More specifically, under output 2 of the project, CAREC will initiate discussions with pharmaceutical laboratories to source PCR supplies. Under output 3 of
the project CRN+ will part-fund its regional coordinator and a secretary, procure the necessary office equipment including one computer and develop outreach
activities. Under output 4 CAREC will recruit a regional adviser on behavioural and social sciences and procure equipment. Under output 5 CHRC will part-fund its director and administrative secretary and initiate one country review programme. Under the same output, CAREC will recruit a HIV epidemiologist
and purchase equipment. For the Project Implementation Unit (PIU), funds are budgeted for operating costs including rent, advertising, supplies, travel and
other costs. In addition, allocations are made to cover the organization of the project inception workshop and inaugural PMG and PAG meetings as well as the
recruitment of a short-term consultant who will assist in the preparation of technical documentation for the project (a brief terms of reference for this consultant
is attached in Annex 2).
ADMINISTRATIVE AND FINANCIAL PROCEDURES
1. Recruitment
The position of project manager shall be open to nationals of all ACP and EU Member States and shall be advertised in the 15 CARIFORUM Member States as
well as abroad and through other networks. Candidates are to be jointly screened by the CARICOM Secretariat and EC Delegation in Georgetown and the most
suitable candidate shall be offered a CARICOM contract for two years in the first instance. The recruitment of the short-term consultant for a period of 4
months in the PIU shall be based on a shortlist, with a minimum of three candidates, provided by the CARICOM Secretariat. The successful candidate must be
a member of the ACP Countries or the EU Member States. The candidate selected shall be endorsed by the EC Delegation in Georgetown. The selection of
short-term administrative staff for the PIU shall be undertaken in accordance with established procedures of the CARICOM Secretariat and the EDF. The
Project Manager for the long term programme, when engaged, will be obligated to review and decide on the possible suitability of the short-term PIU staff for
permanent employment under this project. The recruitment of all technical and administrative staff for the participating institutions paid for from this work
programme shall be undertaken in accordance with the established procedures of each institution and shall be subject to the approval of the CARICOM
Secretariat or the DRAO.
Where staff members are already in post and the project will, to ensure continuation of their work, take over all or part of the funding of the post, the EC
Delegation may grant derogation from these procedures. The institutions will need to demonstrate that a transparent and competitive process of recruitment
was carried out and that a satisfactory annual staff appraisal system is in place.
2. Procurement
For item valued between Euro 250 and Euro 25,000 procurement shall be by direct agreement on the basis of the most economically and technically
advantageous offer selected from three independent competitive quotations.
In addition, if purchases are made from locally established suppliers and the goods concerned are normally sold in the region, they shall be deemed to be
effected on the local market, in the sense of Article 313.2(g) of the Lome IV Convention. In this case the rule of origin does not apply.
3. Reports
A progress report on the activities undertaken during the start-up work programme shall be submitted within 30 days of the end of this work programme, in ten
(10) copies, to the EU Delegation in Guyana.
In addition the draft baseline survey report stated above under the heading "Description of Activities" shall be submitted at least six weeks before the end of the
Start up Work Programme.
The draft report by UWI started above under the heading "Description of Activities" shall be submitted at least six weeks before the end of the Start up Work
Programme.
A Draft Annual Work Programme/Cost Estimate covering the period of 1 July 2001 to 30 June 2002 shall be submitted to the EU Delegation in Guyana for
approval by 30 April 2001.
Financial statements shall be prepared on a quarterly basis showing the expenditure incurred according to the agreed cost estimate. The financial statement,
including copies of bank statements for the period, shall be the basis on which advances to the imprest account are justified and further advances disbursed.
The above-mentioned reports/statements shall be submitted by the project manager to both the DRAO and the EC Delegation in Guyana.
4. Imprest Account
Disbursements under this work programme and cost estimate shall be made to the following bank account:
|
Name: Caribbean Community Secretariat: Strengthening the Institutional Response to HIV/AIDS in the Caribbean
Account No: US Dollar Account - F4CA033547
Bank: Guyana Bank for Trade and Industry
Address: Water Street, Georgetown, Guyana
|
The signatories to the account are as follows:
Group A:
|
Name:
Title:
Name:
Title:
|
Group B:
|
Name:
Title:
Name:
Title:
|
5. Disbursements
An initial advance of eighty per cent of the total value of the work programme/cost estimate will be paid into the imprest account after signature of the
programme. A replenishment may be made as and when required on the basis of the presentation of a financial statement of expenditure backed up by original
supporting documents including bank and cash disbursement records and reconciliation statements with corresponding documentation such as invoice for
supplies, works and services, as well as the relevant contract and procedures for award.
The Project Implementation Unit in CARICOM shall be responsible for the transfer of funds to the participating institutions, who in turn shall account for their
expenditures to the PIU according to procedures to be established by the PIU.
If necessary, an independent audit of the project accounts may be performed at the request of the EC Delegation in Guyana.
SIGNATURES
Signed: Dr. Edward Greene
Head of Human and Social Development Division
CARICOM Secretariat |
Signed: Mr. Tom F. Massie
Acting Head of Delegation
EC Delegation in Guyana and Suriname |
| 14 December, 2000 |
14 December, 2000 |
ANNEX 1
COST ESTIMATE
| BL |
ITEM |
OUTPUT No. |
INSTITUTION |
UNIT |
QTY. |
UNIT COST |
TOTAL |
| 2a |
Operational Costs UWI |
1 |
UWI |
MONTH |
6 |
1,334 |
8,004 |
| 6 |
Training and Seminars |
1 |
UWI |
No. |
1 |
12,000 |
12,000 |
| 6 |
Training and Seminars |
1 |
UNAIDS |
No. |
1 |
37,100 |
37,100 |
| 7 |
Laboratory Support (MTCT) |
2 |
CAREC |
|
|
28,500 |
28,500 |
| 9 |
STAFF |
3 |
CRN+ |
|
|
|
|
| 9a |
Regional Coordinator |
3 |
CRN+ |
MONTH |
6.5 |
1,000 |
6,500 |
| 9b |
Secretary |
3 |
CRN+ |
MONTH |
6.5 |
500 |
3,250 |
| 10 |
Operating Costs |
3 |
CRN+ |
|
|
19,000 |
19,000 |
| 11 |
Training |
3 |
CRN+ |
W/SHOP |
2 |
5,000 |
10,000 |
| 12 |
Equipment |
3 |
CRN+ |
|
|
5,500 |
5,500 |
| 13 |
STAFF |
4 |
CAREC |
|
|
|
|
| 13a |
Communication Advisor (50%) |
4 |
CAREC |
|
6 |
|
7,000 |
| 13b |
Information Advisor (15%) |
4 |
CAREC |
MONTH |
6 |
|
1,000 |
| 14 |
Operating Costs |
4 |
CAREC |
No. |
1 |
3,100 |
3,100 |
| 17 |
STAFF |
5 |
CHRC |
|
|
|
|
| 17a |
Director (20%) |
5 |
CHRC |
MONTH |
3 |
1,000 |
3,000 |
| 17b |
Admin. Secretary (100%) |
5 |
CHRC |
MONTH |
3 |
1,000 |
3,000 |
| 18 |
Operating Costs |
5 |
CAREC |
No. |
1 |
1,000 |
1,000 |
| 20 |
Equipment |
5 |
CAREC |
Computers |
2 |
2,000 |
4,000 |
| 22 |
Country Programme Review |
5 |
CHRC |
No. |
1 |
11,440 |
11,440 |
| 23 |
STAFF |
PIU |
CARICOM |
|
|
|
|
| 23a |
Accountant |
PIU |
CARICOM |
MONTH |
6 |
2,900 |
17,400 |
| 23b |
Admin. Secretary |
PIU |
CARICOM |
MONTH |
6 |
1,440 |
8,640 |
| 23c |
Settlement Costs |
PIU |
CARICOM |
Person |
1 |
3,000 |
3,000 |
| 24 |
OPERATING COSTS |
PIU |
CARICOM |
|
|
|
|
| 24a |
Electricity |
PIU |
CARICOM |
MONTH |
6.5 |
380 |
2,470 |
| 24b |
Telephone |
PIU |
CARICOM |
MONTH |
6.5 |
1,000 |
6,500 |
| 24c |
Rent |
PIU |
CARICOM |
MONTH |
6.5 |
2,000 |
13,000 |
| 24d |
Advertising |
PIU |
CARICOM |
(Partial) |
|
|
10,000 |
| 24e |
Supplies |
PIU |
CARICOM |
|
|
|
1,930 |
| 24f |
Travel |
PIU |
CARICOM |
|
|
15,000 |
15,000 |
| 24g |
Recruitment costs |
PIU |
CARICOM |
Interview |
|
|
9,780 |
| 24h |
Miscellaneous |
PIU |
CARICOM |
|
|
|
1,000 |
| 25 |
Meetings/Seminars |
PIU |
CARICOM |
|
|
|
60,000 |
| 25a |
PAC Meeting |
PIU |
CARICOM |
Meeting |
2 |
3,650 |
7,300 |
| 25b |
PMG Meeting |
PIU |
CARICOM |
Meeting |
2 |
11,350 |
22,700 |
| 26 |
Equipment |
PIU |
CARICOM |
|
|
|
25,950 |
| 27 |
TECHNICAL ASSISTANCE |
PIU |
CARICOM |
|
|
|
|
| 27a |
Short Term Consultant
Miscellaneous for Project
Management
Contingency on Materials |
PIU |
CARICOM |
MONTH |
4 |
4,500 |
18,000
4,325
2,200 |
| TOTAL 392,589 |
EXPLANATORY BUDGET NOTES
a. All figures are in US Dollars
b. 'Output No.' relates to the five Outputs of the project which are used as headings of the Items in the 'Original' Budget of the EC document captioned
"Implementing Document to the Framework Financing Agreement No. 6054/REG". These outputs are, namely:
|
1. An increased pool of appropriately skilled personnel able to contribute to effective policy development, planning and implementation of STI/HIV/AIDS
programmes.
2. Increased regional awareness of the benefits, costs and operational feasibility of interventions to reduce Mother to Child Transmission (MCTC) of HIV.
3. An expanded and effective Regional Network of People Living with HIV/AIDS in six countries advocating for improved care and support and contributing
to national policy development.
4. Improved Regional capacity to design, implement and evaluate.
5. Interventions to reduce high-risk behaviour related to the spread of STI/HIV infection.
6. More comprehensive and accurate information on the course, consequences and costs of the epidemic through improved surveillance, monitoring and
evaluation of national control programmes and through operational research.
7. Establishment of a Project Implementation Unit (PIU) within the CARICOM Human and Social Development Division.
|
Items:
2. Operational Costs - UWI: includes costs for advertising, communications, administrative and secretarial services, local travel, report preparation.
6. UWI - Meeting/Workshop:
|
This meeting will be held in Jamaica and will involve representatives from each campus. Key persons from Haiti, Dominican Republic, and Suriname will also
be invited to participate.
|
UNAIDS -Workshop:
|
A 3-day interactive training for appropriate professionals (UN HIV/AIDS Focal Points and NPAs) from 13 Caribbean countries and territories will be
conducted. These professionals will form a technical network to assist their countries and others to either formulate or facilitate national strategic planning
activities.
|
7. This activity by CAREC will provide technical guidance, equipment and materials to National Laboratories, to facilitate assessment of HIV transmission.
This information will allow for cost benefits studies of the MTCT intervention strategies.
9. Personnel for CRN+ for 6.5 months.
|
(a) Regional Coordinator - 100% of salary.
(b) Secretary - 100% salary.
|
10. Travel and subsistence, materials production, communications and office supplies.
11. Training Workshops:
|
(a) Regional Planning workshops for CRN+ and collaborating agencies to formulate an integrated work plan. The workshop will identify the areas and issues
to be included in CRN+ annual work programme.
(b) 'In-country' meetings in Guyana, Jamaica and Haiti to undertake local policy development activities with CRN+ groups. This is to identify issues to be
incorporated in the policy of the national CRN+ groups.
|
12. Equipment:
13. Staff of CAREC:
|
(a) Regional Advisor (Communications Advisor) - 50% salary.
(b) Information Advisor - 15% salary.
|
Staff at (a) & (b) above, already in place at CAREC.
14. Laboratory support (equipment, reagents, manuals and staff training) Travel and subsistence, materials production, communications and office supplies.
17. Salaries of CHRC staff for three months (identified at:
|
12a. Director - 20% salary, and
12b. Administrative Secretary - 100%.
|
18. Travel and subsistence, materials production, communications and office supplies for
six months.
20. Laboratory support (equipment, reagents, manuals and staff training)
22. Preparatory activities to establish 'Baseline' data and indicators including:
|
- Gathering of information on national HIV/AIDS programmes in all Caribbean countries.
- Convening of a planning meeting to draft strategic plan of
- Implementation and review key HIV/AIDS issues for research, and
- Recruit a Field Supervisor to oversee data management process.
|
23. Staff of PIU:
(a) Accountant. This position will be required to manage the affairs of the PIU on a day to day basis, inclusive of budgetary control, and ensuring adherence to
administrative procedures in the pursuit of the objects of the project.
This officer will be required for the entire duration of the start-up programme, not only to fulfil the accounting and financial functions, including setting up of
the financial/accounting systems, but to perform the following tasks:
|
- Preparation and submission of the advertisements
- Reception and compilation of responses of applicants
- Organizing the logistics of travel and accommodation for interviews
- Reception and compilation of reports from the collaborating agencies
- Drafting of the consolidated report
- Establishing a filing system
|
(b) Admin/Sec. The main function of this position will be involved in the day to day preparation of financial instruments and supervision of stores and assets.
(c) Settlement costs will cover relocation expenses.
24. Operating Costs: The amounts budgeted under 24a, b and c, reflect current cost of utilities and rental within the country.
24d. The project will benefit from in-house contribution from CARICOM advertising machinery. The amounts budgeted reflect a partial contribution of once
weekly advertisements in newspapers in member states.
24e. General office supplies.
24f. Travel costs related to local and regional activities for PIU staff as well as travel and per diem costs for the Short Term Consultant.
24g. Recruitment costs will cover travel and per diem costs for interviewees.
25. Meetings/Seminars
25a. Project Advisory Committee (PAC) meeting (in Trinidad), involving travel and per diem for 3 participants.
25b. Project Management meetings, involving travel and per diem for an average of 18 participants from regional institutions for a period of 3 days.
26. The equipment will be for the life of the project and will include computerware, printing and other office equipment, stationery, installation and installation
costs (some expansion in a, b and c under this item).
Equipment Budget
| EQUIPMENT |
AMOUNT |
UNIT COST (US$) |
TOTAL COST (US$) |
| Desktop Computer |
2 |
2,000 |
4,000 |
| Laptop Computer |
1 |
2,000 |
2,000 |
| Printer |
1 |
1,500 |
1,500 |
| UPS |
2 |
800 |
1,600 |
| Stabilizer |
2 |
800 |
1,600 |
| Anti-glare Screens |
2 |
100 |
200 |
| Photocopier |
1 |
9,000 |
9,000 |
| Scanner |
1 |
600 |
600 |
| Workstations |
2 |
300 |
600 |
| Furniture |
|
|
3,000 |
| Spares |
|
|
590 |
| Facsimile |
1 |
900 |
900 |
| TOTAL 25,590 |
27. Technical Assistance.
(d) Short Term Consultant (STC) will be employed for 4 months in order to supervise the setting up of the PIU and initiate the development of the longer-term
programmes.
ANNEX 2
OUTLINE TERMS OF REFERENCE FOR SHORT-TERM CONSULTANT
Background
See Background Section of Start-up Work Programme
Objective
The purpose of this short-term technical assistance is to assist the CARICOM Secretariat in
launching the regional HIV/AIDS project including in particular the preparation of technical documentation for the project.
The consultant will be recruited under contract to the CARICOM Secretariat and will initially work under the supervision of the CARICOM Head of
Human and Social Development Division and subsequently under the supervision of the Project Manager, once recruited.
Main Tasks
The main tasks to be carried out by the consultant shall include the following:
|
Assist in the recruitment of the Project Manager and the Project Implementation Unit (PIU) temporary staff.
Prepare a written assessment of the short-term staff engaged for the period of the Start-up Work Programme.
Assist in the coordination of preparatory activities being carried out by the participating institutions.
Assist in the establishment and formalisation of the Project Management Group (PMG) and Project Advisory Group (PAG).
Prepare the project inception workshop and inaugural PMG and PAG meetings.
Prepare terms of reference and technical and contractual documentation for the service/grant contracts with the participating institutions.
Prepare the first annual work programme and cost estimate.
Assist in the preparation of progress and other technical reports.
Carry out other tasks as indicated by the Project Manager/CARICOM Secretariat.
|
Qualifications
University degree in Public Health Administration or related discipline. Ten years managerial experience, at least seven of which would have involved close
interaction with international donor agencies. Experience in Public Health Administration and project management.
Knowledge of the financing and
operational procedures of the European Union. Good communication and interpersonal skills.
Duration
4 work months.